EN
CN EN

The outdoor landscape square of Wudalianchi UNESCO Global Geopark Volcanic Geological Museum is under constructionRelease date:2020-05-28

    The outdoor landscape square of Wudalianchi UNESCO Global Geopark Volcanic Geological Museum is under construction. At present, the foundation construction has been completed, and is awaiting for sand backfilling. It is expected to be completed and put into use by the end of July.

   The outdoor landscape square of the museum covers an area of 21825 square meters, including 12387.06 square meters of hardening area and 9437.94 square meters of green area. Since the official construction on May 1, the project of tree planting, rainwater drainage, pipeline laying, land leveling and foundation construction has been completed.

    The main image of the overall landscape design for outdoor landscape square of the museum is the circled diffusing volcanic rocks formed on the surface of the ground after the eruption, and is adopting the theme of water and green land. The museum building is outstanding with the shade of the outdoor landscape and the green land. More than the function of education of science and leisure, it also has the function to lead and direct the streams of visitors and traffic. The setting up of the waterscape fountain coincides with the landscape of Wudalianchi. The green land is covered by the lawn, shrubs and trees constituting different views of plant landscape, forming different greening effects in four seasons.

    At the construction site, the reporter saw that 140 tree species with high survival rate, such as clove, spruce and Mongolian scotch pines, were planted. Dong Ye, the person in charge of the project, told reporters that in terms of the selection on the vegetation and tree species, they aimed to achieve the effect of "different color in four seasons, different scenery in different view" so as to build a high standard green landscape system of urban square and integrate the landscape with the museum function.

    It is understood that after the sand backfilling, the foundation and surface pavement will be carried out, and then the greening plant configuration. After that, it will be opened for use at the same time with the Volcanic Geological Museum.

Back to list
Official WeChat